Torre INBISA, in Barcelona, installs 51 charging points for electric vehicles with a total power of 346 kW.

In this case, 51 semi-fast 7.4 kW charging points of the SELBA model have been installed.

With this installation, Torre INBISA manages to improve the sustainability of its users.

The project includes electrical and communications pre-installation so that all 237 parking spaces in the garage can connect to the system. The total allowable power is 346 kW, enabling simultaneous charging for 93 parking spaces, which represents nearly 40% of the total.

The new charging points, integrated into the charging network managed by EVcharge, feature advanced monitoring and control technology, guaranteeing a safe and worry-free charge.

A SaaS platform implemented in more than 3,000 charging points. Etecnic performs the operation, maintenance, and technical assistance duties.

Etecnic offers vehicle charging solutions for companies, being the leader in 360 installations.

MOVES III Program

Torre INBISA has accessed the Moves III grant for the installation of these charging points. In recent years, Etecnic has successfully managed over 90% of MOVES Plan applications.

Charging points map

Here you can see all the charging points and real-time availability.