Areas for the installation of charging points
Every industry has different needs.
We tailor the solution to your needs.
We design a public service that operates every day, with benefits processed and maintenance included.
Top up for your fleet, your staff, and your customers, based on the actual usage of your parking lot.
We distribute the available power so that each outlet can be connected without having to redo the installation.
Attract a new customer to your business with fast charging that complies with industry regulations.
We tailor the refill to the type of establishment and how your guests will use it.
Why work with Etecnic360
A single point of contact
The same team supports the project from start to finish, without having to rely on multiple suppliers.
Engineering and implementation
We design and carry out installations tailored to each sector and each charging point.
Software y gestión
The EVcharge platform allows you to operate, monitor and charge for charging services all in one place.
Maintenance and support
24/7 remote support and maintenance to ensure the infrastructure continues to operate over time.
Frequently asked questions
What is the difference between installing a charging point at a business and in a public space?
The main difference lies in the use: in a public space, the installation must support many different users and variable schedules, whereas in a company, the use is usually more predictable (fleet, employees, working hours). This changes the required power, the payment system, and the type of management. At Etecnic360, we design each installation according to its actual use.
Do I need the same type of charger in all sectors?
No. Power and charging speed depend on how long vehicles will be parked and how many users will share the charging point. A long-stay car park does not have the same needs as a service station, where the goal is the fastest possible charge.
What should I bear in mind before choosing a charging solution for my sector?
Mainly three things: how many users will be using the facility, how much electrical power you have available at the supply point, and whether you need to bill or manage access individually. From there, the number of points, the required power, and the necessary software can be defined.
Can I expand the installation at a later date if demand increases?
Yes, provided it is planned from the beginning with growth in mind. That is why at Etecnic360 we start with a preliminary study: it allows the electrical installation to be prepared to add more charging points without having to rebuild the infrastructure.
Who is responsible for the management and maintenance once it has been installed?
Etecnic360 includes preventive and corrective maintenance, as well as remote assistance, to ensure the infrastructure continues to operate smoothly over time. Daily management (usage control, billing, availability) is carried out through the EVcharge platform.
Are there any grants or subsidies available for installing charging points, depending on the sector?
It depends on the moment and the call for applications currently in force in each case, as these grants change over time. At Etecnic, we analyze which calls are available for your project and assist you with the processing when applicable.
¿No sabes qué solución necesita tu proyecto?
Each sector has different needs. Tell us about your case, and we will help you define the most suitable charging infrastructure for your organization.