{"id":39187,"date":"2024-05-21T10:56:33","date_gmt":"2024-05-21T10:56:33","guid":{"rendered":"https:\/\/etecnic.bisiestodeveloper.es\/etecnic_en\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/"},"modified":"2026-10-19T11:39:48","modified_gmt":"2026-10-19T11:39:48","slug":"completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project","status":"publish","type":"post","link":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/","title":{"rendered":"Completion of the \u2018Smart Pricing for charging points at petrol stations\u2019 project"},"content":{"rendered":"<p>https:\/\/etecnic.es\/wp-content\/uploads\/2024\/05\/banner-logos-MOVES-signulares-e1715691989543.png<\/p>\n<p style=\"text-align: center;\"><strong><span class=\"TextRun SCXW79105451 BCX0\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW79105451 BCX0\">ETECNIC successfully completes innovative dynamic pricing project, \u201cSmart Pricing\u201d, for electric vehicle charging funded by the EU<br \/>\n<\/span><\/span> <\/strong><\/p>\n<p>Completion of the project <strong>&#8220;Smart pricing for charging points at service stations&#8221;<\/strong>, developed at our headquarters in Reus, Tarragona. This project was <span style=\"font-weight: 400;\">funded by the European Union through the NextGenerationEU program under the Recovery, Transformation and Resilience Plan, and managed by IDAE.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"> This innovative project aims to develop tools to implement a dynamic electric vehicle charging tariff that responds dynamically to demand fluctuations and energy production conditions.<\/span><\/p>\n<h2><strong>Project Description<\/strong><\/h2>\n<p>The project consisted of simulating a service station equipped with advanced EV charging infrastructure. Three types of charging stations were installed: semi-fast (up to 22 kW per outlet), fast (up to 50 kW per outlet), and ultra-fast (up to 180 kW per outlet), allowing us to analyze and optimize operating costs while gaining a deeper understanding of user preferences.<\/p>\n<h3><strong>Objectives<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">To achieve this objective, Etecnic implemented a pilot project at its facilities simulating real-world service station conditions. This environment features three types of charging equipment: semi-fast, capable of delivering up to 22 kW per outlet; fast, with capacity up to 50 kW per outlet; and ultra-fast, offering up to 180 kW per outlet. This variety enables Etecnic to differentiate charging costs and better understand user preferences.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Additionally, the project includes the installation of a 50 kW photovoltaic solar plant and an energy storage system using repurposed batteries with a total capacity of 160 kWh. This setup facilitates solar energy surplus management and enables energy sales during peak demand hours at more competitive prices.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><b>&#8220;Smart Pricing Pack&#8221;<\/b><span style=\"font-weight: 400;\"> developed by Etecnic also integrates artificial intelligence to adjust prices in real time based on multiple factors, such as energy production, charging point demand, and weather conditions, among others.<\/span><\/p>\n<h3><strong>Expected Benefits and Results<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">This approach improves profitability for charging station operators while providing end users with more affordable prices, thereby driving greater adoption of electric vehicles.<\/span><\/p>\n<h3><strong>EU Financial Support<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">With an initial estimated investment of 374,536.75 euros, the project was approved to receive a grant of 183,552.14 euros, representing 60% of the eligible cost.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This Etecnic project promotes the use of advanced, sustainable technologies and contributes to the decarbonization of the transport sector, aligning with European Union objectives to move toward a greener and more efficient energy infrastructure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">ETECNIC MOVILIDAD EL\u00c9CTRICA, S.R.L., C\/Argentera 25, 43202 Reus, Tarragona<\/span><\/p>\n<p><b>Award Date: <\/b><span style=\"font-weight: 400;\">09\/29\/2022<\/span><\/p>\n<p><b>Project Start Date<\/b><span style=\"font-weight: 400;\">: 01\/04\/2023<\/span><\/p>\n<p><b>Project Duration<\/b><span style=\"font-weight: 400;\">: 18 months<\/span><\/p>\n<h3><b>General Aspects of the Program<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The Ministry for the Ecological Transition and the Demographic Challenge has approved <\/span><a href=\"https:\/\/www.boe.es\/boe\/dias\/2021\/07\/27\/pdfs\/BOE-A-2021-12591.pdf\"><b>Order TED\/800\/2021, of July 23<\/b><\/a><span style=\"font-weight: 400;\">, approving the regulatory bases for the Incentive Program for Singular Projects in Electric Mobility (MOVES Singular Projects II Program), endowed with 100 million euros and aimed at the selection and awarding, on a competitive basis, of grants corresponding to singular projects and projects related to experimental and innovative developments carried out within Spanish territory related to electric vehicles.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The MOVES Singular Projects II program is part of Component 1, Investment 2 of the <\/span><a href=\"https:\/\/planderecuperacion.gob.es\/\"><b>Recovery, Transformation and Resilience Plan (PRTR)<\/b><\/a>.<\/p>\n<p><span style=\"font-weight: 400;\">The MOVES Singular Projects II program will be managed by <\/span><a href=\"https:\/\/www.idae.es\/ayudas-y-financiacion\/para-movilidad-y-vehiculos\/programa-moves-proyectos-singulares-ii\/1a-convocatoria\"><span style=\"font-weight: 400;\">IDAE<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><a href=\"https:\/\/etecnic.es\/wp-content\/uploads\/2024\/05\/NdP-Smart-Pricing-Etecnic.pdf\"><strong>Download press release<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>https:\/\/etecnic.es\/wp-content\/uploads\/2024\/05\/banner-logos-MOVES-signulares-e1715691989543.png ETECNIC successfully completes innovative dynamic pricing project, \u201cSmart Pricing\u201d, for electric vehicle charging funded by the EU Completion of the project &#8220;Smart pricing for charging points at service stations&#8221;, developed at our headquarters in Reus, Tarragona. This project was funded by the European Union through the NextGenerationEU program under the Recovery, Transformation and Resilience [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":39186,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[647,987],"tags":[],"class_list":["post-39187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","category-service-station"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The \u2018Smart Pricing for Charging Points\u2019 project comes to an end<\/title>\n<meta name=\"description\" content=\"ETECNIC has successfully completed the innovative, EU-funded project on dynamic pricing for electric vehicle charging\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completion of the \u2018Smart Pricing for Charging Points at Petrol Stations\u2019 Project\" \/>\n<meta property=\"og:description\" content=\"Completion of the \u2018Smart Pricing for Charging Points at Petrol Stations\u2019 Project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Etecnic\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-21T10:56:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T11:39:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"544\" \/>\n\t<meta property=\"og:image:height\" content=\"363\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"etecnic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"etecnic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/\"},\"author\":{\"name\":\"etecnic\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#\\\/schema\\\/person\\\/dd1bd24ce2934073e648829317e35ba7\"},\"headline\":\"Completion of the \u2018Smart Pricing for charging points at petrol stations\u2019 project\",\"datePublished\":\"2024-05-21T10:56:33+00:00\",\"dateModified\":\"2026-10-19T11:39:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/\"},\"wordCount\":519,\"publisher\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Caratula-para-noticias-articulos-48.jpg\",\"articleSection\":[\"Projects\",\"Service station\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/\",\"name\":\"The \u2018Smart Pricing for Charging Points\u2019 project comes to an end\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Caratula-para-noticias-articulos-48.jpg\",\"datePublished\":\"2024-05-21T10:56:33+00:00\",\"dateModified\":\"2026-10-19T11:39:48+00:00\",\"description\":\"ETECNIC has successfully completed the innovative, EU-funded project on dynamic pricing for electric vehicle charging\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Caratula-para-noticias-articulos-48.jpg\",\"contentUrl\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Caratula-para-noticias-articulos-48.jpg\",\"width\":544,\"height\":363},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/projects\\\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of the \u2018Smart Pricing for charging points at petrol stations\u2019 project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/\",\"name\":\"Etecnic\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#organization\",\"name\":\"Etecnic\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/logo-etecnic-blanco.png\",\"contentUrl\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/logo-etecnic-blanco.png\",\"width\":1000,\"height\":500,\"caption\":\"Etecnic\"},\"image\":{\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/#\\\/schema\\\/person\\\/dd1bd24ce2934073e648829317e35ba7\",\"name\":\"etecnic\",\"url\":\"https:\\\/\\\/etecnic.bisiestodeveloper.es\\\/en\\\/author\\\/etecnic\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The \u2018Smart Pricing for Charging Points\u2019 project comes to an end","description":"ETECNIC has successfully completed the innovative, EU-funded project on dynamic pricing for electric vehicle charging","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Completion of the \u2018Smart Pricing for Charging Points at Petrol Stations\u2019 Project","og_description":"Completion of the \u2018Smart Pricing for Charging Points at Petrol Stations\u2019 Project","og_url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/","og_site_name":"Etecnic","article_published_time":"2024-05-21T10:56:33+00:00","article_modified_time":"2026-10-19T11:39:48+00:00","og_image":[{"width":544,"height":363,"url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg","type":"image\/jpeg"}],"author":"etecnic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"etecnic","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#article","isPartOf":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/"},"author":{"name":"etecnic","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/dd1bd24ce2934073e648829317e35ba7"},"headline":"Completion of the \u2018Smart Pricing for charging points at petrol stations\u2019 project","datePublished":"2024-05-21T10:56:33+00:00","dateModified":"2026-10-19T11:39:48+00:00","mainEntityOfPage":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/"},"wordCount":519,"publisher":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#primaryimage"},"thumbnailUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg","articleSection":["Projects","Service station"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/","name":"The \u2018Smart Pricing for Charging Points\u2019 project comes to an end","isPartOf":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#primaryimage"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#primaryimage"},"thumbnailUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg","datePublished":"2024-05-21T10:56:33+00:00","dateModified":"2026-10-19T11:39:48+00:00","description":"ETECNIC has successfully completed the innovative, EU-funded project on dynamic pricing for electric vehicle charging","breadcrumb":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#primaryimage","url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg","contentUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2024\/05\/Caratula-para-noticias-articulos-48.jpg","width":544,"height":363},{"@type":"BreadcrumbList","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/completion-of-the-smart-pricing-for-charging-points-at-petrol-stations-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/etecnic.bisiestodeveloper.es\/en\/"},{"@type":"ListItem","position":2,"name":"Completion of the \u2018Smart Pricing for charging points at petrol stations\u2019 project"}]},{"@type":"WebSite","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/","name":"Etecnic","description":"","publisher":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/etecnic.bisiestodeveloper.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization","name":"Etecnic","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png","contentUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png","width":1000,"height":500,"caption":"Etecnic"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/dd1bd24ce2934073e648829317e35ba7","name":"etecnic","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/author\/etecnic\/"}]}},"_links":{"self":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/39187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/comments?post=39187"}],"version-history":[{"count":1,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/39187\/revisions"}],"predecessor-version":[{"id":39773,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/39187\/revisions\/39773"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/media\/39186"}],"wp:attachment":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/media?parent=39187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/categories?post=39187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/tags?post=39187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}