{"id":37598,"date":"2026-01-12T11:33:00","date_gmt":"2026-01-12T11:33:00","guid":{"rendered":"https:\/\/etecnic.bisiestodeveloper.es\/etecnic_en\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/"},"modified":"2026-07-28T08:14:38","modified_gmt":"2026-07-28T08:14:38","slug":"etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council","status":"publish","type":"post","link":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/","title":{"rendered":"Etecnic360 has completed the project to expand the charging points for the Formentera Island Council."},"content":{"rendered":"<p style=\"text-align: justify; margin: 0 0 15px 0;\">Electric mobility is a strategic priority for public administrations committed to sustainability and the energy transition. In this context, the<br \/>\n<a style=\"color: #03176e; font-weight: bold; text-decoration: none; border-bottom: 2px solid #00e9ef;\" href=\"https:\/\/www.consellinsulardeformentera.cat\/\" target=\"_blank\" rel=\"noopener\">Consell Insular de Formentera<\/a><br \/>\nentrusted <strong>Etecnic360<\/strong> with developing the island\u2019s Public Electric Vehicle Charging Network Development Plan, with the aim of promoting the adoption of electric vehicles in the medium and long term.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 24px 0;\">The Consell Insular de Formentera, made up of the councillors of Formentera Town Council, operates as an entity with its own full and independent legal personality and assumes all the administrative powers and responsibilities corresponding to the Town Council. This unique institutional structure makes the Consell the key authority for the planning and implementation of public infrastructure on the island.<\/p>\n<h2 style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 26px; margin: 28px 0 14px 0; text-align: left; line-height: 1.3;\">Consultancy: analysis of the starting point and strategic planning<\/h2>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">The project began with a specialised consultancy phase aimed at defining a comprehensive strategy for the deployment of public charging infrastructure during the 2024\u20132026 period. The main objective was to provide the Consell Insular with a planning tool that would support decision-making based on technical, economic and environmental criteria.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 12px 0;\">During this phase, <strong>Etecnic360<\/strong> carried out:<\/p>\n<ul style=\"padding-left: 20px; margin: 0 0 22px 0; text-align: justify; color: #333333; line-height: 1.65;\">\n<li style=\"margin-bottom: 8px;\"><strong style=\"color: #03176e;\">Analysis of the existing infrastructure:<\/strong> review of the current condition of the charging points available in Formentera.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong style=\"color: #03176e;\">Definition of the infrastructure plan:<\/strong> design of a network aligned with the territory\u2019s actual needs.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong style=\"color: #03176e;\">Budget planning:<\/strong> estimate of the investment required for the deployment of the network.<\/li>\n<li style=\"margin-bottom: 8px;\"><strong style=\"color: #03176e;\">Environmental assessment:<\/strong> analysis of the impact of the proposed investments.<\/li>\n<li style=\"margin-bottom: 0;\"><strong style=\"color: #03176e;\">Centralised management:<\/strong> definition of the minimum criteria required for the efficient administration of the public network.<\/li>\n<\/ul>\n<p><\/p>\n<p style=\"margin: 0; color: #333333; font-size: 16px; line-height: 1.6;\">This work made it possible to establish a clear roadmap for the development of electric mobility on the island, ensuring consistency between planning, implementation and future management.<\/p>\n<h2 style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 26px; margin: 28px 0 14px 0; text-align: left; line-height: 1.3;\">From planning to implementation: public charging infrastructure<\/h2>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">Based on the defined action plan, <strong>Etecnic360<\/strong> carried out the implementation of the project and the installation of the charging infrastructure.<\/p>\n<p><\/p>\n<p style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 32px; margin: 0 0 6px 0;\">11<\/p>\n<p><\/p>\n<p style=\"margin: 0; color: #333333; font-size: 16px; line-height: 1.5;\">semi-fast chargers distributed across 6 strategic locations.<\/p>\n<p><\/p>\n<p style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 32px; margin: 0 0 6px 0;\">1<\/p>\n<p><\/p>\n<p style=\"margin: 0; color: #333333; font-size: 16px; line-height: 1.5;\">fast charger to strengthen public charging capacity and improve vehicle turnover.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 24px 0;\">The charging points, installed in 2025, form an accessible and efficient public network that is ready for future growth. The network serves both residents and visitors and facilitates the use of electric vehicles on the island.<\/p>\n<p><iframe style=\"display: block; width: 100%; height: 480px; border: 0;\" src=\"https:\/\/www.google.com\/maps\/d\/embed?mid=1C1g1efb5Z4EdQ5Dk5Hj2Uk6UaaLallU&amp;ehbc=2E312F&amp;noprof=1\" allowfullscreen=\"allowfullscreen\"><br \/>\n<\/iframe><\/p>\n<h2 style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 26px; margin: 28px 0 14px 0; text-align: left; line-height: 1.3;\">Digital management, the MELIB network and user experience<\/h2>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">The charging points are integrated into the <strong>MELIB<\/strong> network, which has a white-label application based on the<br \/>\n<a style=\"color: #03176e; font-weight: bold; text-decoration: none; border-bottom: 2px solid #00e9ef;\" href=\"https:\/\/www.evcharge.net\/\" target=\"_blank\" rel=\"noopener\">EVcharge platform<\/a>.<br \/>\nThis solution makes it possible to provide a dedicated application with a corporate identity, while electric vehicle users benefit from an advanced, intuitive and reliable experience.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 20px 0;\">Through the application, users can check the status of the chargers in real time, search for them by location or charging requirements, navigate to them, and charge and pay in just two clicks.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">The management platform for operators includes all the features of <strong>EVcharge Manager<\/strong> under the MELIB brand, enabling the <strong>centralised management<\/strong>, <strong>operational control<\/strong> and <strong>monitoring<\/strong> of the public charging network.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0;\">Thanks to the domain hierarchy, chargers can be differentiated according to their owner, making it possible to independently manage and monitor the charging points associated with each one.<\/p>\n<p><img decoding=\"async\" style=\"display: block; width: 100%; max-width: 500px; height: auto; margin: 0 auto; border-radius: 4px;\" src=\"https:\/\/etecnic.es\/wp-content\/uploads\/2026\/01\/unnamed-1.png\" alt=\"Map of the MELIB network\" \/><\/p>\n<p style=\"margin: 8px 0 0 0; color: #00a9e8; font-size: 15px; font-style: italic; text-align: left;\">All the information about the MELIB network.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">Operators can monitor and control all the charging points in the network from a single platform. In addition, thanks to the domain hierarchy, chargers can be differentiated according to their owner, making it possible to independently manage and monitor the charging points associated with each one.<\/p>\n<h2 style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 26px; margin: 28px 0 14px 0; text-align: left; line-height: 1.3;\">Support with grant management<\/h2>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 24px 0;\">The project received funding through the<br \/>\n<a style=\"color: #03176e; font-weight: bold; text-decoration: none; border-bottom: 2px solid #00e9ef;\" href=\"https:\/\/www.idae.es\/ayudas-y-financiacion\/para-movilidad-y-vehiculos\/programa-moves-iii\" target=\"_blank\" rel=\"noopener\">MOVES III<\/a><br \/>\nprogramme. Etecnic360 supported the Consell Insular de Formentera throughout the documentation and grant application process, ensuring compliance with the technical and administrative requirements and facilitating access to the funding required for the deployment of the public infrastructure.<\/p>\n<h2 style=\"font-family: 'Kanit', sans-serif; font-weight: bold; color: #03176e; font-size: 26px; margin: 28px 0 14px 0; text-align: left; line-height: 1.3;\">A public project aligned with sustainability and innovation<\/h2>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 12px 0;\">Etecnic specialises in providing comprehensive solutions for adapting spaces to electric mobility, including:<\/p>\n<ul style=\"padding-left: 20px; margin: 0 0 22px 0; text-align: justify; color: #333333; line-height: 1.65;\">\n<li style=\"margin-bottom: 8px;\">Needs assessments and strategic planning.<\/li>\n<li style=\"margin-bottom: 8px;\">Infrastructure proposals and energy solutions.<\/li>\n<li style=\"margin-bottom: 8px;\">Design and implementation of projects for public administrations.<\/li>\n<li style=\"margin-bottom: 8px;\">Supply and installation of charging infrastructure.<\/li>\n<li style=\"margin-bottom: 0;\">Cloud-based energy and operational management solutions.<\/li>\n<\/ul>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0 0 15px 0;\">Etecnic\u2019s commitment to innovation, technology and sustainability, together with a multidisciplinary team of engineers, makes it possible to develop technological solutions designed to maximise efficiency in the energy and operational management of public electric mobility projects.<\/p>\n<p><\/p>\n<p style=\"text-align: justify; margin: 0;\">This project strengthens the role of the Consell Insular de Formentera as a public administration committed to the energy transition and consolidates <strong>Etecnic360<\/strong> as a leading technology partner for public entities in the development of sustainable and efficient charging infrastructure.<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electric mobility is a strategic priority for public administrations committed to sustainability and the energy transition. In this context, the Consell Insular de Formentera entrusted Etecnic360 with developing the island\u2019s Public Electric Vehicle Charging Network Development Plan, with the aim of promoting the adoption of electric vehicles in the medium and long term. The Consell [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":37597,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[346,648,649,647,643],"tags":[],"class_list":["post-37598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-etecnic_en","category-evcharge","category-event","category-projects","category-sectors"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Etecnic360 is expanding Formentera\u2019s network of charging points<\/title>\n<meta name=\"description\" content=\"Etecnic360 has completed the expansion of the Formentera Island Council\u2019s public network of charging points, managed in partnership with EVcharge.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Etecnic360 is expanding Formentera\u2019s public charging network\" \/>\n<meta property=\"og:description\" content=\"Discover the project developed by Etecnic360 for the Formentera Island Council: 12 chargers, digital management via EVcharge and integration into the MELIB network.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\" \/>\n<meta property=\"og:site_name\" content=\"Etecnic\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-12T11:33:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-28T08:14:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5-700x454.jpg\" \/>\n<meta name=\"author\" content=\"anna-etecnic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"anna-etecnic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\"},\"author\":{\"name\":\"anna-etecnic\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/0da7a3465710726a5fa6d735b8a7e686\"},\"headline\":\"Etecnic360 has completed the project to expand the charging points for the Formentera Island Council.\",\"datePublished\":\"2026-01-12T11:33:00+00:00\",\"dateModified\":\"2026-07-28T08:14:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\"},\"wordCount\":744,\"publisher\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg\",\"articleSection\":[\"Etecnic\",\"EVcharge\",\"Event\",\"Projects\",\"Sectors\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\",\"name\":\"Etecnic360 is expanding Formentera\u2019s network of charging points\",\"isPartOf\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg\",\"datePublished\":\"2026-01-12T11:33:00+00:00\",\"dateModified\":\"2026-07-28T08:14:38+00:00\",\"description\":\"Etecnic360 has completed the expansion of the Formentera Island Council\u2019s public network of charging points, managed in partnership with EVcharge.\",\"breadcrumb\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg\",\"contentUrl\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg\",\"width\":1110,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Etecnic360 has completed the project to expand the charging points for the Formentera Island Council.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/\",\"name\":\"Etecnic\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization\",\"name\":\"Etecnic\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png\",\"contentUrl\":\"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png\",\"width\":1000,\"height\":500,\"caption\":\"Etecnic\"},\"image\":{\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/0da7a3465710726a5fa6d735b8a7e686\",\"name\":\"anna-etecnic\",\"url\":\"https:\/\/etecnic.bisiestodeveloper.es\/en\/author\/anna-etecnic\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Etecnic360 is expanding Formentera\u2019s network of charging points","description":"Etecnic360 has completed the expansion of the Formentera Island Council\u2019s public network of charging points, managed in partnership with EVcharge.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Etecnic360 is expanding Formentera\u2019s public charging network","og_description":"Discover the project developed by Etecnic360 for the Formentera Island Council: 12 chargers, digital management via EVcharge and integration into the MELIB network.","og_url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/","og_site_name":"Etecnic","article_published_time":"2026-01-12T11:33:00+00:00","article_modified_time":"2026-07-28T08:14:38+00:00","og_image":[{"url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5-700x454.jpg","type":"","width":"","height":""}],"author":"anna-etecnic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"anna-etecnic","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#article","isPartOf":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/"},"author":{"name":"anna-etecnic","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/0da7a3465710726a5fa6d735b8a7e686"},"headline":"Etecnic360 has completed the project to expand the charging points for the Formentera Island Council.","datePublished":"2026-01-12T11:33:00+00:00","dateModified":"2026-07-28T08:14:38+00:00","mainEntityOfPage":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/"},"wordCount":744,"publisher":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage"},"thumbnailUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg","articleSection":["Etecnic","EVcharge","Event","Projects","Sectors"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/","name":"Etecnic360 is expanding Formentera\u2019s network of charging points","isPartOf":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage"},"thumbnailUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg","datePublished":"2026-01-12T11:33:00+00:00","dateModified":"2026-07-28T08:14:38+00:00","description":"Etecnic360 has completed the expansion of the Formentera Island Council\u2019s public network of charging points, managed in partnership with EVcharge.","breadcrumb":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#primaryimage","url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg","contentUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2026\/01\/Blog-Municipalia-2025-5.jpg","width":1110,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/projects\/etecnic360-has-completed-the-project-to-expand-the-charging-points-for-the-formentera-island-council\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/etecnic.bisiestodeveloper.es\/en\/"},{"@type":"ListItem","position":2,"name":"Etecnic360 has completed the project to expand the charging points for the Formentera Island Council."}]},{"@type":"WebSite","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#website","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/","name":"Etecnic","description":"","publisher":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/etecnic.bisiestodeveloper.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#organization","name":"Etecnic","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png","contentUrl":"https:\/\/etecnic.bisiestodeveloper.es\/wp-content\/uploads\/2025\/06\/logo-etecnic-blanco.png","width":1000,"height":500,"caption":"Etecnic"},"image":{"@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/etecnic.bisiestodeveloper.es\/en\/#\/schema\/person\/0da7a3465710726a5fa6d735b8a7e686","name":"anna-etecnic","url":"https:\/\/etecnic.bisiestodeveloper.es\/en\/author\/anna-etecnic\/"}]}},"_links":{"self":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/37598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/comments?post=37598"}],"version-history":[{"count":1,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/37598\/revisions"}],"predecessor-version":[{"id":37599,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/posts\/37598\/revisions\/37599"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/media\/37597"}],"wp:attachment":[{"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/media?parent=37598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/categories?post=37598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/etecnic.bisiestodeveloper.es\/en\/wp-json\/wp\/v2\/tags?post=37598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}